Aerial view of Boho Club on the Marbella Golden Mile at sunset, bungalows and gardens facing the sea

Project · Stone and large format

Boho ClubGolden Mile, Marbella

Large-format cladding through the public areas and a full refurbishment of the guest bungalows, delivered to a hotel's calendar: finished surfaces, no visible seams, no closed doors.

Location
Golden Mile, Marbella
Intervention
Large-format cladding and bungalow refurbishment
Sector
Hospitality

01The project

True luxury lies in the continuity of the surface, delivered while the hotel stayed open.

Realta worked across the Boho Club site: large-format porcelain cladding through the public areas and a full refurbishment of the guest bungalows. Heavy machinery for precision cutting, an artisan's hand for the decorative finishes, and every phase handed back finished before the next guest arrived.

  • 45°

    Mitred edges on large-format slabs

  • Minimum

    Joint width, with continuous veining

  • Zero

    Tolerance plane from technical levelling mortar

  • Open

    The hotel never closed during the works

02Invisible luxury

The detail a guest never notices.

Drag across a bungalow bathroom. On the left, what the eye should never catch: set-out, joints and junctions, resolved before the first guest checked in.

Bungalow bathroom at Boho Club with handmade pink tiles, twin basins and round mirrors

Drag the handle to compare.

  1. Technical ceramic, cut to sizeResolved at the return, no slivers on show
  2. Warm LED fittingIntegrated at selected points
  3. Minimum jointsContinuous alignment across the full wall
  4. Sealed junctionsHigh-precision finishing at every corner

03Under the floor

Four layers under a floor that has to read as one slab.

Large format forgives nothing underneath. The substrate was levelled to a zero-tolerance plane first, so the slabs could be laid with minimum joints and the veining would run on uninterrupted, inside and out.

04The finished spaces

Everything underneath is why it looks the way it does.

Guest bungalow
Pool and main building
Restaurant lounge
Bungalow bedroom
Spa
Garden lounge

05Specification

Every material, and where it went.

The full specification, as it appears in our technical file for the project.

Porcelain & ceramics

Calacatta technical porcelainLarge format, monolithic, marble-like continuityPublic areas, bungalows, terraces
Fish-scale ceramicArtisanal, set out for symmetryFeature cladding
Anti-slip porcelainHigh performanceBungalow floors, wet zones
Technical ceramicCut to sizeWet areas

Substrate

Technical levelling mortarZero-tolerance planeThroughout

Wood & finishes

Engineered timberPremium gradeRest areas
Paint systemHigh durability, smooth and uniformBungalow walls

Lighting

Warm LEDIndirect coves and focal pointsBungalows

06What we executed

Finished surfaces, inside hotel windows.

  1. 01Substrate preparation with technical levelling mortar throughout
  2. 02Handling and cutting of large-format slabs with dedicated machinery: mitres, cut-outs and machining
  3. 03Calacatta and technical marble cladding with minimum joints and continuous alignment
  4. 04Sealing and high-precision finishing at corners, arrises and junctions
  5. 05Anti-slip porcelain flooring throughout the bungalows
  6. 06Fish-scale decorative cladding, set out for symmetry across the full run
  7. 07Technical ceramic to wet areas, cut to size
  8. 08Premium paint finishes, flat and uniform
  9. 09Engineered timber flooring to rest areas
  10. 10Warm LED fittings and indirect lighting integrated at selected points

07The technical challenge

A hotel does not close.

Every phase had to reach a finished, usable state before the next guest arrived, with material handling routed away from occupied areas. Fish-scale tile is unforgiving: the pattern is only as good as the set-out, and it has to resolve cleanly at every corner and edge with no cut pieces on show.

Sculpted relaxation area in the Boho Club spa

08Private consultation

Every project begins with a conversation.

Tell us about the property. Our technical team will review its feasibility and come back to you with the next steps, in confidence.

The more you tell us, the better we can prepare. A phone number is required so we can call you back.

What are you planning?
Where is the project today? · optional

We reply within 24 hours, in English, Spanish or Russian.